Fiscal Court Meeting Search

25 excerpts

  • without putting a bridge in. I think we could do box cover culverts and it's a way cheaper and instead of going through because the amount

  • miles an estimated cost of 626 128 our fourth priority is a culvert replacement project on kentucky 736 approximately from 9.12.66 to 12.7 and estimated cost of that

  • right. Next one is metal culverts. Uh This one is uh no plastic, no bid on any of the plastic. Uh galvanized…That's all they've got on there and this is uh Metal Culverts Incorporated. — It's one Where they at though? — Uh well, the card

  • Spillway is basically just the some call it an emergency Spillway so when the dam is full and

    Matched by meaning, not by keyword

  • spillways or the spillways that had washed kind of just like now um the reason we're coming

    Matched by meaning, not by keyword

  • about uh let's put tiles in clean up ditches because we're gonna cut the cabling too

    Matched by meaning, not by keyword

  • repairs thank you for giving us time yeah thanks everybody again I'm Eric Phillips I'm the

    Matched by meaning, not by keyword

  • permission to start looking at litigation issues against Windstream connect Windstream I agree and and the reason is

    Matched by meaning, not by keyword

  • customers or or citizens that are in Grayson County on the south very southern side of 259 South

    Matched by meaning, not by keyword

  • reason is is because after the water receded on some of them, the road was no longer there

    Matched by meaning, not by keyword

  • it's going to cut that cable and do this nobody's contacted my office or anything and

    Matched by meaning, not by keyword

  • mean that Road's in terrible shape so the project does include a resurfacing at the end once

    Matched by meaning, not by keyword